top of page

Getting things done.
FEATURED PROJECTS


Key Projects GPC ME
• Moray East Windturbine and OSS jackets (client: Deme Procurement) • Seagreen Windturbine Jackets (SSE) • Hollands Kuizd Sued B...


HKZB Offshore Substation Jacket (Eversendai, RAK, 2020-2021)
750MW OSS Jacket (appr. 3500t) Employer TenneT TSO contracted GPC-ME’s Quality Expert Services • Procurement audits • Quality Assurance...


Moray East Wind Farm (Lamprell, SHJ, 2019 – 2020)
• 45 OWA • 3 OSS three legged jackets (appr. 1200t each) EPCI Contractor DEME Offshore awarded GPC-ME • Pre-fabrication-audits • ...


Noirmourtir Offshore Windfarm Grout Silos for wind farm jackets installation offshore
These silos are used at a wind farm to pour the cement into the annular space between the jacket sleeve and the pile.


Pre-Piling Template for wind farm
Supervision the construction of a pre-piling template, a template that ensures that the four piles of the wind turbines are driven into...


KEY PROJECTS TECHNICA NOVA, >1m€
Arcadis Ost 1, Baltic Sea Quality Management (QM), Quality Control (QC) on site TP-less Monopiles, OSS TP, Secondary Steel Moray East,...
bottom of page
